Remodels

Home Remodel

Whole HoME RENOVATION

Location

Montclair Neighborhood, Denver, CO

Project Features

SFH Renovation

Project Scope

General Contracting services included pickup a project 1/3rd through after being contacted by the homeowner to finalize the project. Including: new electric, plumbing, heating and cooling to the entire house, close cell foam insulation, dry wall to a level 4 finish smooth. All Cabinetry and built-ins, tile, countertops, flooring, trim and paint.

Project Details

This client had been abandoned by the original GC about a third of the way through the project. They struggled to find a GC that would take on the project and it sat for about 4 months.

The clients were referred to us by a current client of ours. At which point seeing the struggle the clients had been through at no fault of theirs we jumped in and  took this project on.

We collaborated with existing trade partners that had been engaged at the start of the project and brought them back into the fold to complete their associated scope of work to include all new HVAC systems, electrical, and plumbing. CC completed the framing, and fixed issues from the previous builder.

We brought in our own trade partners to complete the installation of energy efficient closed cell foam, drywall to a level 4 smooth finish, flooring, and painting. CC self performed the installation of the cabinetry to include the kitchen, laundry, mudroom,  bath vanities, built-ins, interior trim, interior doors, custom stairs, and exterior trim.

Through careful and deliberate collaboration with the owner and our trade partners we were able to wrap the project up in 6 months working diligently through the winter.

Ready to Bring your Construction Project to Life with us?

Let’s Send Us Email
info@constructcollab.com

Kitchen Remodel

Location

Hampden Area, Denver, CO

Project Features

SFH Renovation

Project Scope

General Contracting services included new plumbing, upgraded electrical, kitchen ventilation tile, cabinetry, countertops, trip, painting

Architectural Design

Construction Collaborative

Project Details

This client was referred to us through our favorite designer at the Kitchen Showcase. The client was requesting an updated kitchen and updated dining room.

As part of this project we removed interior walls to eliminate the low clearance arches that separated the dining room from the living room and the kitchen from the living room and dining room.

We removed the existing kitchen cabinets, countertops, flooring and trim. We coordinated with our trade partners to install an upgraded electrical system, new mechanical ventilation, and new plumbing in the kitchen.

A new tile floor was installed to give the kitchen its own sense of place different from the adjacent rooms.

New cabinetry was installed with new countertops and a stacked tile backsplash. We topped it off with new lighting to include under cabinet LED lights, new trim and fresh paint.

Ready to Bring your Construction Project to Life with us?

Let’s Send Us Email
info@constructcollab.com

Whole Home Renovation

Location

El Paso County, CO

Project Features

SFH Renovation

Project Scope

General Contracting services included fireplace renovation, upgraded electrical, bathroom tile, cabinetry, countertops, trim, painting.

Architectural Design

Construction Collaborative

Project Details

This project started due to a leak in the existing in-floor radiant heating system. We isolated the location of the leak, removed it and installed new infloor radiant heating system that tied into a new boiler.
 
As part of the demo we reconfigured the sunken living room by changing the stairs and fireplace to bring it up to date. This initial project then rolled into a bathroom renovation project which involved  three of the existing bathrooms. During the bathroom renovation phase we determined we could split the main level full guest bath into a full guest bath and a main level powder room.
 
We renovated the master bathroom and installed a full custom shower with benches, niches, and a smart lighting package. The master bathroom project also included a new fireplace, updated trim and a fresh coat of paint.